you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Margaret McTamany Wood 2840 Louisiana Avenue, Halethorpe, MD
21227 410.991.9270 woodmd@verizon.net Objective ·
Full time position
as a Master Scheduler ·
Current TS/SI
Full-Scope Poly Education ·
Anne Arundel Community College – Computer courses (no
degree) ·
Hesser College, NH – Business & Accounting (no degree) ·
Catonsville High School – Academic Diploma Training ·
Primavera P6 R8.2
Administration Training, CDP – Columbia, MD ·
Primavera P6 R8.2
Fundamentals Training, CDP – Columbia, MD ·
Primavera P6v.7
Advanced Training, CDP – Columbia, MD ·
BLUEPRINTER Audit
Training Skills & Abilities 14 years of experience on programs and contracts of similar
scope, type, and complexity within the Federal Government, most recently as a
Master Scheduler II supporting the EPM III program. Experience includes,
design, development, and maintenance of detailed, resource-loaded schedules
for development, testing, integration, and deployment of operational systems. Experience January 2014 – Present (1
year, 10 months): Scheduler 2, ProSync Technologies Group On EPM III supporting BA1 as a
Scheduler Level 2 for BA16, T2E1, I321, I23: · Created
and revised Integrated Master Schedules. Tracks multiple projects and tasks; and
identifies and records the impact of work performed and not performed as
scheduled · Performs
analysis of program schedules to determine dependencies, critical paths,
resource conflicts, etc., to analyze performance against technical objectives
creating metrics · Participates
in all aspects of program schedule planning, development, delivery and
maintenance · Serves
as the Primavera 6 Administrator managing accounts; maintained calendar for
Primavera training with customers. · Developed
outline training slides for Fundamental users course for starting a Primavera
schedule. · Incorporates
Resource and/or Cost Loading data into schedules as required · Provides
and reports schedule changes to higher management · Assists
in the planning and scheduling to develop technical engineering change
proposals (ECPs) · Provides
implementation of schedule processes that support an overall program Earned
Value (EV) Management process · Developed
customer level metrics, using statistical analysis models and standards as to
track progress and achievements from beginning to end · Analyzed
and prepared metrics (PowerPoint and Excel) presentations which resulted in management
metrics reporting, generation and submission · Designated
the Subject Matter Expert, providing assistance and advise to fellow
schedulers in MS Project and Primavera P6 R8.2 May 2013 – December 2014 (7
months): Master Scheduler II, PILAR Services On EPM II working on the BA9 portfolio on LI21 as
a Master Scheduler II: · Scheduled
over 60 infrastructure projects around the NSAW campus. · Routinely
collaborated with Project Managers and Activity Managers to incorporate all schedules
into a Master Schedule and provided weekly updates to address progress,
milestones, and overarching requirements and objectives for the portfolio. · Integrated
new schedule information with existing program activity schedules · Utilized
Primavera and BLUEPRINTER to provide governance, project-team participation,
and project visibility. · Used
Primavera to track linkages and dependencies between related projects and
assist the managers with analyzing the impact and risk associated with these dependencies. · Designed,
developed and maintained detailed schedules for product build, development,
testing, implementation, and integration. · Developed
and modified schedules for multiple projects and integrated these into an
overall Master schedule. March 2008 – May 2013 (5
years 2 months): Master Scheduler, L-3 Communications On EPM II working several different programs. · Coordinated
and collaborated with Program Management on the integration of multiple
project schedules into an overall Master Program Schedule. · Maintained
the overall Master Program Schedule in Primavera. · Coordinated
with Oversight and Compliance Rules Management Group to ensure adherence to
version control processes, policies, and procedures; maintained all historic
and current FISA documents · Assisted
with the set-up/modification of an existing web application to capture
Configuration Management Items for the IMP to control and validate data input · Provided
snapshots for BRASSCOIN submissions till no longer required. · Provided
weekly metrics from data to provide information to Project Managers for
program reviews. · Compiled
schedules for D4 on all the processes and document surge processes. · Maintained
the schedule product build, staging, testing, and deployment. · Developed
schedule version control processes, policies and procedures to ensure that
they were followed and the project remained on a schedule. · Defined
and implemented schedule configuration management processes and procedures to
manage changes in the requirements and verify proposed changes were
systematically considered and impact evaluated by creating and maintaining a
database and checklist routinely reviewed with developers, project managers,
test engineers, and stakeholders January 2005 – March 2008 (3
years 2 months): Scheduler, L-3 Communications, Titan Group Responsible for MS Project schedules for three
programs on EPM II. · Developed
and maintained detailed, resource loaded schedules in MS Project for two,
high-level PMO schedules, each detailed to lower-level activities · Routinely
coordinated with leadership to support of CBJB and CBS submissions; providing
metrics for various reports. · Created
snapshots of the project schedules to make jpeg files for BRASSCOIN Quad
Chart submissions. · Confirmed
the NES baseline for HW/SW anticipated to be used. · Submitted
Acquisition Security Forms and drafted Baseline Exception Requests. · Our
group held a conference where I was able to use my earlier experience with
NASA Coordinators to help set up our own conference from setting up conference
rooms with break-outs, making binders for the white papers, name badges that
were for each participant and table tents for the speakers at the table. January 2002 – December 2003
(1 years 11 months): Scheduler, Northrop Grumman, Oceanic Division · Oversaw
monthly maintenance of several programs’ Integrated Master Schedules. · Responsible
for defining and implementing schedule configuration management processes and
procedures, developing checklists and data sheets used for reporting of
current metrics · Responsible
for the EV data exports to the Financial Analyst’s for these programs on a
monthly basis. · Provided
the Program Manager’s with snapshots of project schedules, graphs and charts
for Program Management Reviews. · Pulled
together nine IPT leads schedules into one Master Schedule for a large
program. · Developed
schedule version control processes, policies and procedures and ensured that
they were followed. January 1999 – January 2002 (3
years): Senior Staff Assistant/Scheduler, Litton, Amecom (then was sold to
Northrup Grumman) · Responsible
for earned value (EV) status and maintenance of a major program’s Integrated
Master Schedule on a weekly basis with monthly delivery. · Maintained
the schedule product build, staging, testing, deployment, and integration. · Other
monthly responsibilities included updating and delivery of the program’s
Technical Performance Measurement Reports and the Manpower Charts. · Interfaced
with EV reporting and analysis, including large data exports for EV
software. · Upkeep
of program employees’ access to the program Calendar, coordination/scheduling
of meetings and conference calls. · Documented
procedures and automated reports wherever possible. · Created
policies to ensure version control of schedules and ensured that the
processes and procedures were followed. · Provided
graphs, charts, and assistance with program deliverables (IBR, PDR, CDR) and
executive review material as required. · Developed
instructions and procedures to ensure all program/project schedules were
formatted and repository compatible consistently ensuring version control April 1995 – January 1999 (3 years 10 months) Jorge Scientific,
Administrative Assistant; Westover Consultants, Office Manager Worked a contract with NASA putting together all of their big
conferences local and across the country. Started off as an Administrative
Assistant; left as the Office Manager. · Set up a database for each
conference using Apple’s File Maker Pro. · Customized each conference
including graphics for name badges and table tents. · Some conferences included a
compilation of White Papers which had to be gathered, copied and put into
binders for each attendee. · Travel arrangements along
with hotel accommodations; then expense reports were executed upon completion
of travel (including currency exchange when applicable). · As Office Manager,
including the above, needed to make sure every crate (complete with all
materials) for every conference got out of the door on time. · Took care of all office